New Cumnock substation – Civils package & 132kv installation

O’Rourke Construction Ltd (OCL) were contracted by our repeat client to undertake the following works from the AIS to the GIS within New Cumnock substation.

  • Supply of all site documentation preconstruction
  • Supply of all site management, engineers, supervisors, Health & Safety
  • All Excavation works
  • Supply and installation of concrete ODSE foundations for 2no. circuits
  • Supply and installation of ODSE structures for 2no. circuits
  • All Temporary works designs
  • Duct installation for 2no. circuits
  • All reinstatement works
  • Installation of 132kv cable
  • Installation of Fibre Optic cable
  • Supply of scaffolding around the AIS structures and the GIS structures
  • Supply of all plant, equipment and materials for the project

Share this post: