Acting as principal contractor delivering the project from start to finish consisted of:
- Remediation.
- Piling with Pile Caps & Ground Beams
- Utilities Infrastructure
- Earthing
- Fencing
- Access Roads
- Finishing Works
- The bespoke steel structure was fabricated and installed.
- The FEX cabin, generator and accessories were lifted into position.
- A temporary access road was installed to the neighbouring land to assist with the deliveries.