North Kyle Project

O’Rourke Construction Ltd (OCL) were awarded a 132kv package from our client.

The OCL team undertook various works on the project including:

  • Supplied all site management and resources for the project
  • Supplied all plant, equipment & materials for the project
  • Supplied all cable plant, equipment and accessories
  • Installation of 6no. Cable sealing end (CSE) structure foundations
  • CSE structure installations.
  • CSE’s installation
  • Installation of trackway
  • 1000m of trench excavation and duct installation works – Works encountered very challenging ground conditions within a peat bog and typical Scottish adverse weather conditions. Excavation and duct installation install as per design.
  • 1no. road crossing excavation and reinstatement
  • 1000m of 132kv HVDC cable installation from North Kyle substation to New Cumnock substation.
  • Installed, erected and secured cables to the CSE structures
  • OCL supplied the crane for lifting the cables and securing to the cable supports stands on the CSE structures
  • Supplied scaffold from design to erection for the cable installation at the convertor station.
  • Fibre Optic installation, including excavation of intermediate pits
  • Link box constructed and installed at joint bay
  • Fibre optic chambers constructed and installed throughout the route
  • Reinstatement works of joint bay, both substation bell mouths and full easement reinstated with topsoil.